A scale model of the Mars Ascent Vehicle is loaded by Wind Tunnel Test Engineer Sam Schmitz into the trisonic wind tunnel at NASA’s Marshall Space Flight Center for testing.

September 25, 2023

A scale model of the Mars Ascent Vehicle is loaded by Wind Tunnel Test Engineer Sam Schmitz into the trisonic wind tunnel at NASA’s Marshall Space Flight Center for testing. The 14-by-14-inch tunnel has been used to test launch vehicle configurations for Artemis, Redstone, Jupiter-C, Saturn, and more.

Credits

NASA/Jonathan Deal

ENLARGE

You Might Also Like