CURIOSITY IMAGES
Assembly and Testing
February 14, 2009
A group of engineers and technicians prepare to mate the rover (tucked inside its backshell and turned upside-down on the left) to its protective heatshield, the black disk on the right.
February 14, 2009
A group of engineers and technicians prepare to mate the rover (tucked inside its backshell and turned upside-down on the left) to its protective heatshield, the black disk on the right.